10
Special installation
For greater lengths, the installation must be made with a
project previously approved by our technical service.
Modifications to any of the following may be required for such
a project:
- Tube dimensions.
- Refrigerant charge.
- Suction traps.
- Suction accumulator.
- Liquid solenoid valve.
In such cases, the maximum lengths which can be recommended
are:
Compact installation of the units
The units are supplied prepared for cooling and electrical
connections.
To install the heat pumps as a compact unit, the outdoor
BCVO and indoor BCVI units must be joined by using the
holes in each unit and the screws supplied in a bag in the
electrical box in the case of BCVO/I-60 and inside the indoor
units of BCVI-20/25, 30/40 & 45.
The BCVO and BCVI units are supplied with the refrigerant
circuit connections ready for welding, and to be interconnected
on the outside of the casing.
The BCVO/I-20, 25, 30 and 40 have only one circuit. The
BCV-45, 60 and 80 units have two circuits. The refrigerant
load should be carried out at the jobsite.
Charge procedure
1.- De-pressurise the units.
2.- Drain the refrigerant.
3.- Clean out with dry nitrogen.
4.- Solder the tubes, with a dry nitrogen flow inside the
tubes.
5.- Use low melting-point rods with a minimum silver content
of 5% for soldering.
6.- Fill with 2 kg R-22 refrigerant to detect leaks.
7.- Empty out the refrigerant.
8.- Clean out with dry nitrogen.
9.- Create a vacuum down to 200 microns.
10.- Put in the refrigerant, using scales or a calibrated cylinder.
The charge accuracy should be of 30 grams.
The outdoor unit is fitted with pressure and temperature
points on the connection outlets, for checking of over-heating
and sub-cooling. Check that these values are around