2.08 POST PROJECT REPORT
(A) At the conclusion of the project, the Contractor shall provide a report to the owner indicating
the following:
1. Success of the cleaning project, as verified through visual inspection and/or
gravimetric analysis.
2. Areas of the system found to be damaged and/or in need of repair.
Inga kommentarer:
Skicka en kommentar